CASE STUDIES

Swan Systems Furniture Southampton

This has been a nice local project for a great local business. At Swan Systems Furniture West end helping transform their outbuilding into a new showroom installing Suspended ceilings, Bulkheads, Partitions re boarding and plastering thoughout.

The project was completed in four days.

Science Park Porton Down Phase

M&M Interiors are proud to have contributed to a 1.2 million pound project at Porton Down Public Health, England.

We have completed over 600 square metres of suspended ceilings and bulkheads. 
 

Laurence House, Hythe.

Completed two flats finished to a high spec and good standard.
.
Works included: Steel Beam encasements,
Insulation , Acoustic party wall partitions, Suspended ceilings, Drylining , Float and set & plastering


St Mary’s Surgery, Southampton. 
Two new Acoustic Partitions built giving the Surgery new consulting rooms


Rivendale House, Eastleigh - 13 Flats.

At Rivendale House we have helped convert this run down office block into 13 modernist apartments with ten refurbished and three new flats on the top floor.

We’ve worked closely with the main contractor, Rivendale Homes, on this refurbishment project working without plans and doing design and build as we went. The project was done in three phases, two for the refurbishment and the third giving us the top floor which was quickly transformed installing party wall partitions, Celotex, MF Suspended ceilings, internal partitions, acoustic insulation, dry lining and plastering throughout.


Cobblers Rd, Woking. Two five bedroom luxury homes.

This has been a very straight forward project from start to finish, with our management we’ve completed the project in four weeks while also working to the highest standards and maintaining good health and safety on site.

Works included: 
Floor screeding, Rendering, Celotex - loft insulation, direct fix - drylining , Plastering.

We feel we’ve given these luxury homes the finish they deserved.

  


Itech store London Road Portsmouth.

New suspended ceiling installed for Itech.
 

Woolston Surgery Southampton.
Two new extensions plus refurbishment, 5 phases completed.


Woolston Surgery involved two new extensions, one of which was by the main entrance and the other at the rear on top of the existing building.

Works included: Loft insulation, insulation to partitions, direct fix fireline board with tape & joint, Drylining, metal stud partition, Suspended ceilings , plastering , soundcoat, wall linings, sound board. All installed to British standards.

Challenges involved working inside a busy and active Surgery loading materials through the building whilst being respectful of patients and staff at work.

We held our own tool box talks on site and working alongside Resides site management we avoided peak times to load materials or carry out any works in communal areas which involved working in quitet times of the day within the surgery or out of hours which we did.


Finchampstead Surgery :  Four Extension plus refurbished in areas.

Finchampstead Surgery works included four new extensions plus refurbishment of the existing reception area. All works have been carried out to the highest British standards.
Works included direct fix plaster board, drylining, insulation - loft insulation and selotex, plastering and bulkheads.


Challenges were working alongside an active Surgery plus doing phases of out of hours work which suited the Surgery.
All sub contractors where given a site induction, we also gave our own in house tool box talks about site layouts and being respectful of the people using the Surgery as well as keeping dust and noise to a minimum. Our team worked with Reside to carry out works over a weekend to complete the reception phase.

This project took 5 weeks to complete.


Alresford: 2 Flats refurbished PHASE 2 

The rear of the old Natwest bank has been converted into two very nice apartments including some old features like the bank vault door opening. Works undertaken were: metal stud partitions, wall linings, mf suspended ceilings, direct fix & dryling, insulation and plastering. Challenges were leaving access to the first flat and fixing ceiling supports at three meters. We agreed to leave one wall completely undone so the builder could bring through the kitchen, doors and other materials rather than through the finished building. We made a return vist to the flat when it was almost finished, we drylined and plastered the rear wall which had been used for access, drilling supports at height meant that we hired a scaffold tower and assembled as we are PASMA trained.

The project took 2 fitters and 2 plasters 10 days and was a 6k project.

Alresford: Retail Refurbishment, PHASE 1 

The old Natwest bank in Alresford was a small retail refurbishment in which we transformed into a beauty salon finished to a very high standard and very high spec in acoustic value of partitions and suspended ceilings.
Works undertaken included: metal stud partitions, mf suspended ceilings, insulation, acoustic-fire mastic, direct fix, plastering.
Challenges were trip hazards, keeping on top of waste as a site in general and working along side eight other tradesmen on this compact project it was paramount we kept waste, dust, leads to a minimum. 
We had a complete tidy up before leaving site each day and used sky hooks for any leads, our site forman had a daily site meeting to agree where they would be working and liaise with other trades to ensure work was ready for the fore coming days.

The shop took 3 weeks for two fitters and two plasterers and was a 13K project.

Surbiton: 30 units refurbished. 

We undertook a big refurbishment in Surbiton, works undertaken : Drylining, direct fix, overboarding, mf suspended ceilings, insulating walls and ceilings, fire/acoustic mastic were necessary, plastering.
The idea was to was to refurbish the building to a high standard but keeping some of its old character.
Challenges were working with a lot of other trades in one building at the same time, access to the floors as there was only one stairwell and no loading bays on the scaffolding.

Our site foreman took part in daily site meetings going over where trades would be working each day, our priorities and the main contractors. Materials where loaded up manually, we worked weekends to have clear access of the stairwell.

The project took six months to complete the three blocks and was a 150k project.


 

"I used M&M Interiors to do the suspended ceilings on one of my projects, very efficient and great finish."

Stephen Davies, Ayrton Construction Ltd

"I found M&M Interiors knowledge specifically helpful getting the fire rating right for NHBC, a good team of guys."

Ian Scammel, Developer

"Ben and his guys built new partitions, transformed shape and worked around us."

Nigel Johnson, Office Tenant